Unifire Saw Spezifikationen Seite 1

Stöbern Sie online oder laden Sie Spezifikationen nach Kreissägen Unifire Saw herunter. Unifire Saw Specifications Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 11
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Gas Powered Positive Pressure Ventilator
Owners/Operators Manual
3924 E. Trent Ave.
Spokane, WA 99202
(509)535-7746 (509)535-9064
1-800-745-3282
Seitenansicht 0
1 2 3 4 5 6 ... 10 11

Inhaltsverzeichnis

Seite 1 - Owners/Operators Manual

Gas Powered Positive Pressure VentilatorOwners/Operators Manual3924 E. Trent Ave.Spokane, WA 99202(509)535-7746 (509)535-90641-800-745-3282

Seite 2 - Specifications

Important InformationProper procedures for long termstorage of the PPV will protect it againstcontamination and damage. If the PPV isnot to be operate

Seite 3 - WARRANTY

Parts Break DownDescription Part Number Qty Notes1. Front Shroud FS____ 1 Specify model number or shroud size*2. Back Shroud BS____ 1 Specify model nu

Seite 4 - Safety Precautions

Congratulations on your purchase of the best Posi-tive Pressure Ventilation fan in the industry, theUnifire Electric PPV. We use only the highest qual

Seite 5 - Introduction

Page 2WARRANTYIf for any reason, the PPV should becomedamaged, call toll free in the USA and Canadaat 1-800-745-3282. All warranty work must beauthori

Seite 6 - Preparation

Page 3Do not allow anyone to operate thePPV without first reading this manual and/orbecoming familiar with and trained in its op-eration. Unifire has

Seite 7 - Operation

Page 4IntroductionOpen the shipping carton immediatelyupon receipt. Visually inspect the contents fordamage and/or missing parts. If damage isevident,

Seite 8 - Maintenance

Page 5Preparation1) This PPV is a specialized type of powerequipment, designed for a specific job func-tion. Each operator must receive adequateinstru

Seite 9

1) Place the PPV at the desired operation lo-cation. The location should be relatively flatto prevent tipping.2) Turn the ignition switch into the ON

Seite 10 - Important Information

Allow the engine to idle for a minuteand observe the unit. Observe safety pre-cautions mentioned in the beginning of thismanual. After the engine has

Seite 11 - Parts Break Down

MaintenanceShrouds produced after July 1993 are3/16" wire - the strongest shroud availableto the fire service. A retrofit kit is availablefor old

Kommentare zu diesen Handbüchern

Keine Kommentare